An operating room project starts with the work the hospital intends to perform. A new theatre, a refurbishment and a complete operating department can have very different requirements. Define the clinical service first so the space, technical systems and procurement plan develop together.
1. Write the surgical service brief
List the specialties, typical procedures, patient groups and expected workload. Confirm whether emergency work, day surgery or inpatient surgery is included. These choices inform the number and type of rooms, recovery capacity, equipment and staffing. Record the intended first phase and any later expansion separately.
- Identify the hospital’s clinical lead and the people approving the project.
- Map the services shared with the wider hospital, including imaging, blood services and sterile supply.
- Describe how the service will operate when a room or a major device is unavailable.
2. Plan the whole operating department
Work through the patient, staff, sterile supply, used-instrument and waste pathways. Include preparation, scrubbing, recovery, storage, utility rooms and staff support around the operating rooms. In an existing building, check access, structure, ceiling space and the connection to adjacent hospital departments before fixing the layout.
3. Coordinate specialist engineering
Bring the clinical, architectural and engineering teams into the same room-data review. Discuss ventilation, medical gases, electrical supply and backup, lighting, communications and finishes. A device schedule should show connection points, loads and mounting needs, so ceilings, walls and technical services can be prepared before installation.
4. Make equipment part of the design
The table, lights, anaesthesia workstation, monitoring, electrosurgery and specialty systems occupy a shared working space. Review their positions, cable and hose routes, access for cleaning and movement around the patient. Include compatible accessories, instruments, consumables and reprocessing needs in the procurement brief. Check what can be reused from the current service.
5. Agree delivery and opening checks
Assign responsibility for ordinary construction, specialist medical packages, equipment installation and clinical preparation. A staged programme should connect room completion with commissioning, documented acceptance, user training and operating readiness. Agree which drawings, equipment records and maintenance information will be handed over, and who signs off each stage.
Prepare your first discussion